01 Outubro 2008
11:30 Horas
Notícias
Arquivo Notícias
Boletíns
Editoriais
Revista Virtual
SOF História
Artigos
Documentos
Links
Fotos
Vídeos
Eventos
Busca Arquivo
  Defesa@Net
A Empresa
Equipe
 

Projeto F-X2
DEFESA@NET 01 Outubro 2008
FAB 01 Outubro 2008
Força Aérea Brasileira

Projeto F-X2

Ministry of the Defense
Command of the Brazilian Air Force
CENTRO DE COMUNICAÇÂO SOICIAL DA AERONÁUTICA

Brazilian Air Force Command Preselects
candidates of Project F-X2
(Portuguese version - original FAB )

The Command of the Brazilian Air Force informs that, in obedience to the cronogram of renewal of the fleet of the combat aircraft the Brazilian Air Force - FAB, completed plus a stage of the process of selection of the new multi-role fighter to be incorporated to the force.

The Managemental Commission of Project F-X2 (CGPF-X2), instituted in 15th of May of 2008, lead the evaluation studies of the preselected aircraft (Super Boeing F-18E/F Hornet, Dassault Rafale, Eurofighter Typhoon, Lockheed Martin F-16 Adv, Saab Gripen NG and Sukhoi SU-35), of form to elaborate a reduced list (shorts list) in this stage of the process.

The concretion of this shorts list aimed to guarantee to meet the operational requirements for fighter aircraft multi-role established by the High Command of Brazilian Air Force and to allow to the deepening of the evaluations of the systems of weapons candidates who had been selected in this phase.

The studies had had for base the information supplied for the companies in reply to the Request For Information - RFI, emitted in June of 2008. The data supplied by the participant companies had been evaluated in a systemic process, considering the following aspects: operational, logistic, technical, Commercial Compensation (offset) and technology transfer for the National Industry of Defense.

From now, in the new stage of the selection process, the evaluations will go to concentrate in the following aircrafts of the shorts list (listed here in sequence alphabetical of the respective manufacturers):

The 36 aircraft, that will integrate 1st lot, will have to be delivered from 2014, with useful life expectancy of, at least, 30 years. Thus, throughout the next years, it will have the substitution, gradual, of the current fighers Mirage 2000, F-5M and A-1M. The set of acquired knowledge and technological qualification in this acquisition will go to contribute so that Brazil will have conditions to produce or to participate in the production of a fighter of Fifth Generation in a medium and long run future.

Finally, the Command of Brazilian Air Force states that this process represents an important advance for its Industry of Defense with lasting consequences, making possible strategic partnerships of long duration. In running of the next year, the vector will be selected and announced, so soon the subsequent phases are concluded.


CENTRO DE COMUNICAÇÂO SOICIAL DA AERONÁUTICA
Source: CECOMSAER
Translation: DEFESA@NET

   
   
   
   
   
   
   
 
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
© 2006 Defesa@Net™- Direitos Reservados