Defesa @ Net
Year  V - edition  12 Special English
English Translation from a Portuguese Report Issued in 07 JAN 05

 F-X is Dead - Long Live F-X

 
Nelson During

    The date of, 10 th November of 2003, marks the last meeting and exchange of official notes between the representatives of the five participants on Program F-X (Mirage 2000BR, Su-35, F-16C/D, MiG29 and Gripen),  and members of the Brazilian Government. It includes in these contacts   the Coordinating Commission of the Program Aircraft of Combate (Comissão Coordenadora do Programa Aeronave de Combate-COPAC), Brazilian Air Force (FAB) and Ministry of Defense.

    During 14 (fourteen) months of a complete silence and time delay actions (vide Inter-ministerial Commission of Evaluation of the Program created by the former minister Jose Viegas Dec2003). 

    However, if the time measured by the hourglass of the Luiz Inacio (LULA) government follows particular and special laws, for the industrial participants of  F-X Program the sand grains of the hourglass had flowed in different way. For some he was excessively fast and for others, they would like that the time remained motionless.

    The irrealism of this process left the potentiality and entered in the hard reality of the industrial and commercial survival. In 2004 the world-wide aerospace & defense industry realignment was accellerated: Russia, United States, China, France, United Kingdom, Sweden, Italy, India, Japan, etc., had in such a way had important alterations and definitions in programs as in industrial arrangements and strategical alignments.  

    What we saw in Brazil? A total irrealism or the full execution of the ostrich politics. We ask for to the permission the Commander Nero Moura, for using the symbol of  the glorious one "Senta a Paul", in this form.( Ostrich was the simbol of theAir Force Fighter Group that operated at World War II)

    When the time of the hourglass of the industrial groups was depleted and had started to move itself, generated unusual reactions in Brasilia. The participants exist and still of diffuse form they had shown its existence, in last December. Alerted for an aerial, improper connection, made under the lights of the searchlights. Which the form of that the government answers? Now it starts to feel itself on pressure. The F-X reaches its maturity, as well as the government Luiz Inacio ( LULA), when having for the front  a real crisis, in which it does not have more ideological allies or good-will. It has now, agreements on : strategic, politics, industrial or business fields.

    In these fourteen months the FAB emitted  three documents, two to reaffirm that is it who directs the choice (P-3BR and F-X) , and a long document published in aviation magazine, in April of 2004, defining the tecnhical principles that guide the choice of the F-X program. In three documents it gives continuity, or it establishes, a  friendly fire dialogue, in special with Embraer company.

    However the time is inflexible and the diplomatic imbróglio, who was generated to the along these years, exceeds the simple technical questions. Today, the meat exporters already suffer retaliation by the Russian embargo to the lack from a definition on the case. Will other countries follow the same way: France the USA, Sweden, UK and Spain (P3BR)? To remember that Prime Minister Zapatarero will visit officially Brazil in January (23-25). E in DAVOS (JAN 29) will be   President Jacques Chirac waiting, more the following Heads of State, waiting chances to present their proposals: Tony Blair, Goran Persson, Thabo Mbeki, Guy Verhofstadt, Jan Peter Balkenende without forgetting "friend"  George Bush. 

    Twelve fighters do not support an industry, but in the global war and without quarter for the industrial and technological survival EVERYTHING influences the game.

    Defesanet published in 08 of April of 2004, that the only concrete reality was of purchase of an interin fighter, called "GAP Filler". Also we mentioned  the options that were being evaluated at the time. This is the only information since that time that remains real and uncosteded. E in this the government and the FAB are working.  Nine last months  and.......

F-X Is Over(?) or the F-X of the B - English   -  08 Jan 2004             http://www.defesanet.com.br/dn/09ABR04.htm

Brazilian Government Plans Cancel Fighters Buy  - Zero Article - 08 April 2004 - English
http://www.defesanet.com.br/fx/zhfxeng/

FAB Defends Licitation - portuguese  12 November 2003                                        http://www.defesanet.com.br/noticia/fxpropostas1/

A new time for the F-X, author Cosme Degenar 15 July 2003 Important reading for details of the Licitation (Portuguese)                                          http://www.defesanet.com.br/noticia/fabgapIV/espera.htm

F-X Project BR: the retaken  process, author Cosme Degenar  30 October 2003 Portuguese  - http://www.defesanet.com.br/noticia/fxaretomada/retomada.htm


Defense @ Net

Publisher Nelson F During - nelson_during@defesanet.com.br  

To sign he sends message with the word signs  assinar@defesanet.com.br

To cancel he sends message with the word cancels assinar@defesanet.com.br

In case that it wants to redispatch this message leaves who clearly is redispatching.